Overview
๐Ÿ“Š Dashboard
Management
๐Ÿ  Full Budget โš™๏ธ Pricing ๐Ÿ“‹ Contractor
Please be aware

Overall Budget items are still under review

The ICF components on this sheet are accurate. All other items are still a work in progress. Please review them carefully before relying on the overall total.

$356,883
priced so far, ex GST
9 of 20 elements resolved ยท 11 unresolved
Draft
Rate sources and confirmations live in Pricing โ†’
2 things to finishAssign 12 rooms across 1 level ยท Resolve 11 unpriced elements
ChecksNo blocking pricing errors

QS pricing readiness

9 priced ยท 0 allowances ยท 0 excluded ยท 11 unresolved

49 priced project rows ยท 4 rates required

0 used rows need source checks

11 zero-value cost centres, including explicit exclusions

โœ“ ICF reconciled 12 rooms unassigned across 1 level
Assign 12 rooms
Wall systems reconciliation ICF $81,488 ยท Timber $7,501 โœ“ ICF reconciled โœ“ Timber priced
ICF Wall System $81,488.35
External 12 walls ยท 136.58 mยฒ ยท $43,923.96 ยท $321.60/mยฒ
Internal 5 walls ยท 55.83 mยฒ ยท $16,222.11 ยท $290.56/mยฒ
Foundation 66.94 mยฒ ยท $21,342.28 ยท $318.83/mยฒ
Audited split reconciles to the canonical ICF ledger: $81,488.35 = $81,488.35.
Timber Wall System $7,501.25
External 0 walls ยท 0.00 mยฒ ยท $0.00
Internal 10 walls ยท 88.25 mยฒ ยท $7,501.25 ยท $85.00/mยฒ
Current measured and priced totals.
Model checks ICF โœ“ 12 rooms to assign

ICF contribution by building level โ€” all 1 levels included

This isolates the model-calculated ICF shell for checking. Non-ICF trade estimates remain whole-project values unless separately itemised.

LevelWallsCore sizesBlocksNet wall areaConcreteSteelLabourBase ICF contribution
Ground Floor
Elevation +0.000 m
17
12 ext + 5 int
102 / 152 224 192.4 mยฒ 25.28 mยณ 1249.6 kg 62.8 hrs $68,360.18
Calculated level contributions$68,360.18 Foundation / project-wide / Overall Budget scope adjustment$+13,128.17 ICF-related works total$81,488.35

Fitout quantity scope by building level โ€” all 1 levels included

Room geometry is measured on each level independently. Finishes remain zero until a room is classified and a fitout choice is selected.

LevelDetected roomsAssigned roomsMeasured ceilingSelected wall liningSelected ceiling liningSelected floor finish
Ground Floor 12 0 155.64 mยฒ 0.00 mยฒ 0.00 mยฒ 0.00 mยฒ
Showing rows currently used by this building.
Budget tools โ–พ
โž• Expand All โž– Collapse All ๐Ÿ“‹ Show Entered Only ๐Ÿ’พ Save as Template ๐Ÿ“‚ Load Template ๐Ÿ‡ณ๐Ÿ‡ฟ Fill Missing NZ Rates ๐Ÿ“Š Populate allowances & PC sums